Garage Rebuild *9*

PRAISE TO THE WEATHER GODS MAN !

This weekend, the weather was cold, but fine !

It didn’t rain and that was all I needed to get my work on the outside done !

Pic’s 1 trough 7: Coming out of the garage into the house ( which wasn’t easy, knowing the house is made of concrete with irons beams inside the concrete ) with the cables in the tubes, 2 times STP for network, 1 tv cable, 1 electrical wiring cord…

The holes are already closed up with TEC-7, but I didn’t take a picture of that … sorry mate :p

Garage Rebuild *8*

Due to the crappy weather nowadays and the need to get this fixed BEFORE doing anything else inside, I was in need of a nice day…without rain πŸ™‚

This is the result of and hour of digging πŸ™‚ -> Few meters long … +-35cm deep.

That’s all for the update … except that every electrical wire inside is hooked up and working as it should be :p

Windows Mobile 6.5 Pro. on E-Ten/Acer DX900

As of today, I’m using WM6.5pro on my dx900.

Installation went fast as hell, setting everything up was easy πŸ™‚

Download the rom from the userboard @ E-Ten, download the latest rom from the acer or e-ten website.

Start the install … before you click finish at step three of the install, copy the downloaded rom from the userboard, paste this into your %temp% folder (found by open start -> run -> %temp%) and paste this here… it will ask to overwrite data … click YES πŸ™‚

Then on the install, click proceed. This will copy the WM6.5 rom to your device … wait for it … wait for it … SOFT RESET the device … if it doesn’t help, pull out the battery-pack… πŸ™‚

Set up the screen … all done πŸ™‚

Garage Rebuild *7*

Hello Ladies …

It’s been awhile since I updated the blog… mainly because I have been pretty busy with everything else :p

Update contains: Locked away gate … one window out … all studs for walls set … all electrical lines in place … all tv, network and beamer cables in place …

It has been quite the pain in the ass getting everything as I want it πŸ™‚

See for your yourself …

  1. Window got out πŸ™‚
  2. Entry corner
  3. This is were the TV is going to be placed …

Lower row is the wall were the garage door used to be πŸ™‚

Smell ya later Mr. poopypants !

Garage Rebuild *6*

Placing metal studs for gyproc πŸ™‚

All the wall’s except at car entry level are done, I have put some gyproc with isolation on… looks fine πŸ™‚

  1. Studs around the window
  2. Studs in front of the wall
  3. Here he (Moses) is again … enjoying some wool :p
  4. Plates that are going to be used
  5. Wall
  6. WallΒ²

I got a little further than this, but this will be visible a bit later on πŸ™‚

Garage Rebuild *5*

Allright !

After a good day of work the ceiling of my garage has been fully isolated and almost all of the beams for the “Gyproc” plates are up !

  1. The beginning of the beam placing :p
  2. … During …
  3. 3/4 of the beams are up πŸ™‚ ( battery-pack was empty πŸ™ )
  4. Moses likes the glasswool isolation πŸ™‚